• John Hancock Potable Water Tank Inspection

    CommTank was hired to provide a cleaning and inspection service at the John Hancock Towers in Boston, MA. The Hancock Towers have an 8,000-gallon wooden and a 6,000-gallon streel aboveground storage tank that supplies drinking water to the building. Before work could begin on the tanks a written health and safety plan and a confined space entry per....

    Read full article
  • Umass Medical Lifeline Helicopter

    This project was important to us because we earned the trust of a hospital that provides an emergency service. CommTank relocated the fuel system and tested the fuel storage tank used by the helicopters. CommTank replaced components of the fueling system, relocated the filtration system so that it was closer to the helipad, painted the piping and ....

    Read full article
  • Navisite Generator Base Tank Repair

    CommTank was contacted by NaviSite to conduct an investigation into the leak in order to try to determine the exact location diesel was entering the secondary containment basin of their generator set.  NaviSite also asked CommTank to investigate the possibility of repairing the leak.  It was determined that diesel was entering the seconda....

    Read full article
  • Umass Dartmouth Tank Painting and Relocation

    CommTank was enlisted by UMass Dartmouth to replace the underground 20,000-gallon #6 fuel oil storage tank for it's steam plant with two 40,000-gallon above ground tanks. The work involved the dismantling and removal of the old tank as well as inspections, component upgrades, and painting of the tanks to be installed. The used oil tanks were salv....

    Read full article