IBM Backup Generator Day Tank
Before we could disconnect the old day tank we provided two rental tanks to IBM for the duration of the project. The outside tank was temporarily taken off-line and a 275-gallon Granby with secondary containment was connected in its place. Inside a 130-gallon Roth rental tank was used to cover the day tanks while the new Pryco day tanks with duplex oil pumps were being piped into place. The aboveground storage tank that was the primary supply to the backup generator was sanded and painted and the fuel lines connecting it were upgraded from copper to steel double wall piping. A containment sump that had been taking on water was replaced with a new OPW FlexWorks sump and Veeder Root interstitial sensor. At the completion of the project IBM had double-wall containment on all tanks and supply lines, which brought them up to code. |
| Project Photos |
 |
 |
| |
|