Projects

     

Manchester By the Sea

To start the project, we submitted a detailed installation drawing along with the tank specifications to the local fire department to get approval to install the oil tank. Then a flat bed truck was required to transport the tank. Additionally, a crane, rigging, and 3-man crew was needed to move it from the truck to the basement. Eighty feet of steel pipe was installed by our technicians to connect the tank to the outside wall so the oil company could access the fill pipe. This job was definitely not your ordinary oil tank installation.

Project Photos
 
 

 

 
     
 
 
 
   

Projects

References
   

FAQ's

News
   

Links

Employment
   

Letters

Request an
Estimate