Greater Boston Legal Services
The scope of work at GBLS did not conclude there. CommTank was back at the site less than four months later to complete further work. This time we were contracted to install one 15-gallon aboveground fuel storage day tank, and complete the closure in place of one 60-gallon AST. Tanks that are closed in place are typically those under a building foundation, which cannot be properly removed without threatening to impair the foundation of the building. In order to complete a closure in place, you must first obtain written permission from your local Fire Department. Once the tank was completely drained, CommTank filled it to capacity with slurry. Subsequently, the supply, return, and vent lines, along with the fill pipe were completely removed
After presenting proper installation drawings, plans and cut sheets to the Boston Fire Department, it was time to begin operation. Under the oversight of G-12 licensed Kevin Hoag, CommTank installed a Pryco day tank, complete with a double wall leak detector and double wall vent kit, on the roof of the building. The next task on the crew's list was to close a 60-gallon tank in place. They first had to pump out all product from the tank and associated piping. CommTank cut open the tank to properly remove all remaining sludge and sediment. The tank was then filled in place with inert material/foam, and all associated vent and fill pipes were fully removed.
Satisfactory operation of the day tank system was ensured prior to being placed in operation.
|
| Project Photos |
 |
 |
| |
|