Residential Oil Tank Upgrade

This project video goes through the complete process of replacing a 275-gallon steel tank with two 130-gallon tanks. Smaller tanks are used instead of a similar 275-gallon tank to accommodate workspace restrictions that were not present at the time of the original tank's installation.

The crew starts by removing the vent and fill pipes, then pumps the oil from the existing tank into a temporary holding tank. Once the oil is gone, a hole is cut in the side of the tank to access the inside for sediment removal. The clean tank is then cut in half and carried out of the basement in separate pieces.

The new tanks are brought into the basement and fitted with thermal switches before being positioned for installation. Once the tanks are level and secured to the floor, double-wall copper lines are installed to connect the tank system to the burner. An oil filter and a tiger loop are installed to ensure a reliable flow of clean fuel. The tanks are now ready for the old fuel to be pumped back in. Click the link to the right and watch how we did it.

Project Movies
Oil Tank Upgrade Video
 

 

 
     
 
 
 
   

Projects

References
   

FAQ's

News
   

Links

Employment
   

Letters

Request an
Estimate