Eastern Bank
A 10,000-gallon double-walled fiberglass tank was chosen as it's replacement. Included are some photos showing the removal of the old tank and the installation of the new. The tank was installed while the bank was open. No interruption to the regular operation bank occurred. The drive through tellers located next to the tank pad remained open during the project and it was completed with one week. |
| Project Photos |
 |
 |
| |
|