Projects

     

Marlborough Hospital Third Party Pre-Inspection


The purpose of a third party tank screening is to make sure the tank is up to code. It is a practical first step for older tanks that may require updates before an actual inspection is performed. The 1000-gallon tank had single wall steel piping and cement block access holes to the tank top. Based on the age and condition of the tank we recommended testing the tank before doing any upgrades. After the tank failed, it was removed and replaced by an aboveground steel fuel tank.

Project Photos
 
 

 

 
     
 
 
 
   

References
   

FAQ's

News
   

Links

Employment
   

Letters

Request an
Estimate