Marlborough Hospital Third Party Pre-Inspection

CommTank conducted a Third Party Pre-Inspection Tank Screening of one 20,000-gallon Underground Storage Tank (UST) and one 1,000-gallon UST.

The purpose of a third party tank screening is to make sure the tank is up to code. It is a practical first step for older tanks that may require updates before an actual inspection is performed. The 1000-gallon tank had single wall steel piping and cement block access holes to the tank top. Based on the age and condition of the tank we recommended testing the tank before doing any upgrades. After the tank failed, it was removed and replaced by an aboveground steel fuel tank.

Contact CommTank today for expert third party inspection services in Massachusetts and New Hampshire: 1-800-628-8260